Tag: floor Levelling
By: Stoyan Tags: concrete flooring, floor, floor grinding, floor Levelling
The age at which concrete should be before you can lay a smooth compound on top of it can vary depending on several factors, including the type of concrete, curing conditions, and the specific smoothing compound you plan to use. In general, concrete should be allowed to cure for a minimum of 28 days before […]